| |
|
Structural design for a two-story office and design center that manufactures aircraft landing gear for the aerospace industry
|
| Steel frame with post-tensioned concrete foundation |
Three lines of bridge cranes accommodate the assembly process
Curved canopies and playful shapes on the exterior
|
Allow flexible use to suit different product lines
Increase assembly capacity into the future |
Use of high bay for equipment and product changes
Close coordination with both the Port of Snohomish County (owner) and Goodrich (lessee) |
| Freiheit + Ho Architects |
| |